Skip to content
TRILOGY

Data Centre Facilities & Operations

Power, cooling, out-of-band access and one control plane for the estate you operate.

When this becomes relevant

New room or rack densification. UPS or cooling end of life.

  • UPS and power-quality design

  • Liquid and rack cooling distribution

  • DCIM rack/row/power visibility

  • Out-of-band management

Technologies we implement

We select the platform against your requirement, existing estate and support model — not the other way round.

  • Schneider Electric (APC)
    • EcoStruxure IT
    • UPS
  • Vertiv
    • Liebert UPS
    • CDU
  • Cisco
    • Intersight
  • Dell Technologies
    • OpenManage
    • iDRAC
  • HPE
    • OneView
    • iLO
  • Lenovo
    • XClarity

Names and trademarks belong to their owners.

What you receive

  • Power & cooling design

  • Single-line diagram review

  • OOB access design

  • Lifecycle baseline

  • Handover pack

What we offer

01

Design & architecture

  • Sizing
  • High-level and low-level design
  • Bill of materials

02

Implementation & migration

  • Installation and configuration to the approved design
  • Migration waves and cutover
  • Tested rollback

03

Verification & handover

  • Test plans, results and sign-off
  • As-built documentation and runbooks
  • Knowledge transfer
  • UPS and power-quality design
  • Liquid and rack cooling distribution
  • DCIM rack/row/power visibility
  • Out-of-band management
  • Firmware baselines and lifecycle automation
  • Telemetry and capacity trends
An engineer checking a panel beside UPS and cooling units in a plant room

Capabilities in detail

UPS and power-quality design
What
UPS and power-quality design
How
Designed with your team, implemented in approved change windows and verified against the agreed scope before handover.
You receive
Power & cooling design
Liquid and rack cooling distribution
What
Liquid and rack cooling distribution
How
Designed with your team, implemented in approved change windows and verified against the agreed scope before handover.
You receive
Single-line diagram review
DCIM rack/row/power visibility
What
DCIM rack/row/power visibility
How
Designed with your team, implemented in approved change windows and verified against the agreed scope before handover.
You receive
OOB access design
Out-of-band management
What
Out-of-band management
How
Designed with your team, implemented in approved change windows and verified against the agreed scope before handover.
You receive
Lifecycle baseline
Firmware baselines and lifecycle automation
What
Firmware baselines and lifecycle automation
How
Designed with your team, implemented in approved change windows and verified against the agreed scope before handover.
You receive
Handover pack

Discuss your requirement

Prefer to talk? Call +966591909277

We use the information you provide to respond to your request. Read our privacy notice for details.